We understand the many complexities involved in design, compliance, and deployment. Business needs are always evolving — your voice, video, data, and analytics solutions should too. Since our founding, our family values and innovation have guided our work. Over the years, we have built an enviable reputation in wireless solutions. Honesty. Integrity. Service. This is what you will get from VEGA along with a reliable quality signal for every job – no matter how big or small. We will keep you connected.

  • Site surveys
  • System design & permitting
  • System installation
  • Grid testing & Reporting
  • Monitoring and On-Going Support
image

In-Building DAS Experts

Expertise and Experience in Wireless Solutions

Vega’s technical team is a recognized leader in Canada's wireless industry. Our technicians are certified in all the products we install. With backgrounds in various fields of expertise, our technicians share and pool their knowledge to meet all challenges that comply with standards and legislation.

Highly trainined certified technicians
Compliance with legislation
Relationships with mobile network operators
Advanced technology
Proven expertise: +10.000 installations
Fully managed service

30

years of cellular coverage experience

10000 +

Installations

A Customer-Centric Approach

Our In-Building solutions include

Project Management

Vega will manage your coverage project from start to finish, assigning a project manager to ensure a successful deployment within established deadlines.

Project Planning & Site Survey

A project's success hinges on effective planning. One of our experts will perform a comprehensive site survey and take readings to ensure amplifiers, cables and antennas perform optimally without congesting the external network.

Technical Drawings & Report

This step helps optimize hardware investment while ensuring a good outcome. The larger the surface to be covered, the more complex these drawings will be. We provide a written report after each installation.

Installation by Certified Experts

Our team of veteran technicians, certified with manufacturers and wireless service providers, will install and ensure the quality of equipment to be used at deployment sites.

FAQ

Frequently Asked Questions ?

Do you have a warranty?

Given the constant evolution of mobile frequencies and technology, periodic adjustments and updates are required. We provide service and upgrades and ensure manufacturers' guarantees are honoured.

Industry Canada legislates frequencies to ensure their proper use. It is important to work hand in hand with wireless providers to see that radio frequencies are used in a legal manner, as their illegal use can cause network problems and lead to federal prosecution or fines. We adhere to industry best practices and meet industry standards.

We do offer a motoring program based on individual customer needs. Also, we provide annual preventative maintenance services to ensure optimal system performance. Maintenance services are customized to suit the needs of your unique system. With a full-service DAS monitoring and maintenance program, your in-building wireless networks will continue to operate at maximum performance.

Yes, we`ve been certified in many industries over the years and one them is the Food Industry. We do meet the standards and we conducted many projects in this industry. Do not hesitate to contact us no matter what type of industry you are in.

Yes we can. Besides, we completed an LTE 5G project in the National Research Council Montreal building on Royalmount Avenue. Because pharmaceutical products are critical to well-being, the industry is highly regulated and has strict procedures to follow. We understand and rest assure that we meet industry requirements.